In order to use the fifth floor of a building in Via Farini in Milan, an attic area of 700 square meters was raised by two meters using hydraulic jacks.

Milan Ingegneria developed the work process with an operational phase plan that kept the water-resistant roofing, systems and photovoltaic panels intact.

Go to the project