Container Terminal of the Port of Rijeka, Rijeka (Croatia)

The project consists of the construction of the Zagreb Pier container terminal in Rijeka, the main Croatian port. Works aim to better exploit the depth of the sea to enable docking of container ships of fifth and sixth generation. The pier will be 680 m long and a service area with 20-meter high pre-fabricated structures will also be constructed.

Client

Autorità Portuale di Rijeka (Fiume)

Period

2012 – In progress

Amount

€ 110.000.000

Project

MCA – Mario Cucinella Architects con Enrico Iascone Architetti, Manens Tifs Srl, GREENCURE Marilena Baggio Paesaggista, GAE Engineering Srl